A project manager and project team developing a new product are discussing which work methods and tools to use to build the deliverable. What should the result of this discussion be? A. A detailed mitigation plan on the risks for each work method and the tools used B. A technology roadmap for creating similar deliverables in the future with the same tools C. An agreed-upon work method and tools that should t the business need and project constraints D. A consensus that everything will run as anticipated once the tools and work methods are identified Correct Answer: C This question is in PMP exam For getting PMP Certificate