An engineer must deploy a Cisco UCS C-Series Server with a single VIC 1455 integrated into a Cisco UCS Manager cluster. Two fiber connections are available, and the deployment has no fabric extenders. Which set of actions accomplishes this goal? A. Reset the system using Cisco IMC to its factory default settings.Attach VIC port 1 and 3 to Fabric Interconnects. B. Configure VIC attached ports as Uplink ports on fabric interconnects.Insert 1000Base-T RJ45 SFP in VIC port 1 and 3. C. Reset the system using Cisco IMC to its factory default settings.Insert 1000Base-T RJ45 SFP in VIC port 1 and 3. D. Configure VIC attached ports as Uplink ports on fabric interconnects.Attach VIC port 1 and 3 to Fabric Interconnects. Â Suggested Answer: D This question is in 350-601 DCCOR exam For getting CCNP Data Center Certificate Disclaimers: The website is not related to, affiliated with, endorsed or authorized by Cisco. Trademarks, certification & product names are used for reference only and belong to Cisco.