An engineer must perform an assessment of a customer LAN for a future IEEE 802.11ac Wave 2 wireless deployment. All access switches are Fast Ethernet- capable only, and the wired infrastructure between existing APs and access switches is based on the CAT 6A standard. Which two actions provide maximum support of Cisco 3800 Series access points? (Choose two.) A. Replace the existing switches with mGig switches. B. Ensure that cable distances between access switches and APs are not longer than 55 meters. C. Replace the existing switches with gigabit switches with 10 G uplinks. D. Ensure that cable distance between access switches and APs are not longer than 100 meters. E. Replace the existing wiring infrastructure with the CAT-7E wiring standard. Â Suggested Answer: AC This question is in 300-425 Designing Cisco Enterprise Wireless Networks (ENWLSD) Exam For getting Cisco Certified Network Professional Enterprise (CCNP Enterprise) Certificate Disclaimers: The website is not related to, affiliated with, endorsed or authorized by Cisco. Trademarks, certification & product names are used for reference only and belong to Cisco. The website does not contain actual questions and answers from Microsoft's Certification Cisco.
Please login or Register to submit your answer