Refer to the exhibit. An engineer is about to establish a mobility peer connection between a Cisco Catalyst 9800-CL version 16.10.1 e and Cisco AireOS 5520 version 8.8.120.0. The data path between the 9800-CL and AireOS 5520 is up, but its control path is down. Based on the configuration, what is the root of the issue? A. The data-link-encryption configuration is missing from the 9800-CL configuration. B. CAPS is used to key in the MAC address in the IOS_XE configuration, which causes the control path to be down. C. Encrypted mobility is being used in the 5520 configuration, which causes the control path to be down. D. The certificate hash key is missing from the AireOS 5520 WLC mobility configuration, which causes the control path to be down. Â Suggested Answer: D This question is in 300-425 Designing Cisco Enterprise Wireless Networks (ENWLSD) Exam For getting Cisco Certified Network Professional Enterprise (CCNP Enterprise) Certificate Disclaimers: The website is not related to, affiliated with, endorsed or authorized by Cisco. Trademarks, certification & product names are used for reference only and belong to Cisco. The website does not contain actual questions and answers from Microsoft's Certification Cisco.
Please login or Register to submit your answer