Refer to the exhibit.Server 1 fails to connect to the storage array over the Storage Area Network (SAN) of the Cisco MDS 9000 Series Switch. The requirements are to redesign the storage network and keep these considerations in mind: • The traffic from each of the servers must be redundant and isolated. • The design must tolerate hardware and software failures and upgrades of SAN fabric devices. Which action must be taken to meet these requirements? A. Enable NPV and F-Port-channel on ports that face Server 1 on the Fibre Channel switch to create redundant paths. B. Create a SAN port channel that faces the storage device to sustain a link failure. C. Add an additional supervisor to the Fibre Channel switch to support nondisruptive upgrades. D. Place an additional Fibre Channel switch to create two physically independent storage fabrics. Suggested Answer: A This question is in 300-610 Designing Cisco Data Center Infrastructure (DCID) Exam For getting Cisco Certified Network Professional Data Center (CCNP Data Center) Certificate Disclaimers: The website is not related to, affiliated with, endorsed or authorized by Cisco. Trademarks, certification & product names are used for reference only and belong to Cisco. The website does not contain actual questions and answers from Cisco's Certification Exam.
Please login or Register to submit your answer