Refer to the exhibit. The MDS-EDGE-Switch and MDS-Core-Switch are configured with NPV and NPIV features. The FLOGI from Cisco UCS is received by the MDS-Core-Switch on interface fc1/2. An engineer tried to move all traffic between the MDS-EDGE-Switch and MDS-Core-Switch from interface fc1/2 to fc1/3, but the attempt failed. Which set of actions completes the configuration? A. Shut down fc1/1 in the MDS-EDGE-Switch. Re-apply the command. Enable interface fc1/1. B. Disable the NPIV feature in the MDS-EDGE-Switch. Re-enable the NPIV feature. Disable interface fc1/3. C. Disable the NPV feature in the MDS-EDGE-Switch. Re-enable the NPV feature. Disable interface fc1/1. D. Shutdown fc1/3 in the MDS-EDGE-Switch. Re-apply the command. Enable interface fc1/3. Â Suggested Answer: A This question is in 350-601 DCCOR exam For getting CCNP Data Center Certificate Disclaimers: The website is not related to, affiliated with, endorsed or authorized by Cisco. Trademarks, certification & product names are used for reference only and belong to Cisco.
Please login or Register to submit your answer