VCF design workshops have been conducted, and the architect collected the following customer requirements for the newly planned VCF infrastructure: • The new VCF infrastructure is targeting two zones: DEV/UAT and DMZ. • The infrastructure team requested that the number of management components be minimized as much as possible. • Eight hosts should be ordered for the DEV/UAT environment. • Four hosts should be ordered for the DMZ environment. • The DEV/UAT workloads must comply with an erasure coding vSAN storage policy and have the ability to tolerate the failure of two hosts. Which workload domain sizing will be required to achieve these requirements? A. 12-hosts workload domain for both zones, having an 8-hosts DEV/UAT cluster, and a 4-hosts DMZ cluster B. 8-hosts DEV/UAT workload domain, having an 8-hosts DEV/UAT cluster, and a 4-hosts DMZ workload domain, having a 4-hosts DMZ cluster C. 8-hosts DEV/UAT workload domain, having a 4-hosts DEV cluster, and a 4-hosts UAT cluster, in addition to a 4-hosts DMZ workload domain, having a 4-hosts DMZ cluster D. 12-hosts workload domain for both zones, having a 4-hosts DEV cluster, a 4-hosts UAT cluster, and a 4-hosts DMZ cluster Suggested Answer: B Community Answer: A This question is in 5V0-31.22 VMware Cloud Foundation Specialist (v2) Exam For getting VMware Certified Specialist – Cloud Foundation 2022 Certificate Disclaimers: The website is not related to, affiliated with, endorsed or authorized by VMware. Trademarks, certification & product names are used for reference only and belong to VMware. The website does not contain actual questions and answers from VMware's Certification Exams.
Please login or Register to submit your answer