You plan to migrate an SAP ERP Central Component (SAP ECC) production system to Azure. You are reviewing the SAP EarlyWatch Alert report for the system. You need to recommend sizes for the Azure virtual machines that will host the system. Which two sections of the report should you review? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point. A. Hardware Capacity B. Patch Levels under SAP Software Configuration C. Hardware Configuration under Landscape D. Database and ABAP Load Optimization E. Data Volume Management  Suggested Answer: AD It is important to note that there are 2 types of data collected for Hardware Capacity. ✑ Performance Data - e.g. CPU and Memory utilization data. Hardware Capacity data shown in the EWA is measuring CPU and Memory utilization data. This is known as Performance Data. ✑ Configuration Data - e.g. OS information, CPU type. It is also collecting system information about the host such as hardware manufacturer, CPU type etc. This is known as Configuration Data. Incorrect Answers: E: Data Volume Management focuses on whether the collection of DVM content for the EarlyWatch Alert report is not performed, not activated, or not possible because the SAP Solution Manager system does not meet the technical requirements. References: https://wiki.scn.sap.com/wiki/display/SM/Hardware+Capacity+Checks+in+EWA This question is in AZ-120 Planning and Administering Microsoft Azure for SAP Workloads Exam For getting Microsoft Certified: Azure for SAP Workloads Specialty Certificate Disclaimers: The website is not related to, affiliated with, endorsed or authorized by Microsoft. The website does not contain actual questions and answers from Microsoft's Certification Exams. Trademarks, certification & product names are used for reference only and belong to Microsoft.
Please login or Register to submit your answer